Load Centers O&M – King Abdulaziz International Airport

We keep the power-distribution centers feeding one of the Kingdom's most important airports fully operational, around the clock.

Electrical infrastructure that cannot stop

Load centers are the power-distribution rooms that receive supply and distribute it to airport facilities: terminals, baggage systems, HVAC, lighting and support systems. Any fault there affects airport operations directly.

Working within Saudi Binladin Group's scope at the airport, Qimam operates and maintains these centers with qualified electrical teams, strict safety procedures and continuous monitoring through control and SCADA systems.

01LocationKing Abdulaziz International Airport, Jeddah
02Main contractorSaudi Binladin Group
03ScopeLoad-center operation & maintenance
04StatusOngoing
05Facility typeCritical 24/7 infrastructure

Walk through a typical load center

Drag to orbit, scroll or pinch to zoom, and tap the numbers to see what we maintain in each part. Switch on thermal scan to see how hot spots are found before they become faults.

Loading the 3D model…
MV switchgearBreaker, relay, busbar and interlock inspection.
TransformerOil, insulation, temperature and connection checks.
LV distribution boardsBreaker maintenance, torque checks and thermal scanning.
Cable traysCable routing, grounding and support inspection.
SCADA stationFeeder status, alarms and load trend monitoring.
Illustrative model, not an actual site layout

What we do inside the load centers

MV & LV switchgear

Preventive and corrective maintenance of breakers, relays, busbars and protection.

Transformers & distribution boards

Routine insulation, temperature, connection and torque checks.

Control systems & SCADA

Monitoring feeder status, alarms and load trends to catch faults early.

Testing & thermal inspection

Infrared thermography, insulation and protection testing to approved standards.

Emergency response

Teams ready to respond fast to any outage or alarm to keep supply continuous.

Documentation & asset records

Maintenance reports, asset registers and controlled documentation for every load center.

Every intervention follows five stages

  1. Inspect & monitor

    Routine rounds, SCADA readings and thermal scans establish each asset's condition.

  2. Plan & isolate safely

    Permits to work, isolation and earthing before any intervention.

  3. Maintain & repair

    Preventive and corrective work executed to the approved schedule.

  4. Test & re-energise

    Protection and insulation tests, then re-energising and verifying performance.

  5. Report & record

    Asset records updated and condition reports issued to the client.

Reliable power for a vital gateway

At the airport we apply the standards our ISO 9001, ISO 45001 and ISO 14001 certificates carry, whose scope covers maintenance of motors and generators and construction and maintenance of power plants and transformers.

Load Centers O&M – King Abdulaziz International AirportLoad Centers O&M – King Abdulaziz International AirportLoad Centers O&M – King Abdulaziz International Airport